Driveway before the demolition started
Demolition was interesting to watch. They now use a jack hammer attached to a bob cat that get the job done in a matter of minutes. Than they take the jake hammer off and use the claw like scoop and haul the huge pieces of cement down the long driveway and put into the dumpster.
Devin is a funny kid. He moves slower than a turtle but is very good at what he does. His father and brother work together. They are just good ole country folks that start there day at 2:00. At least that has been my experience. Both his father and he talk very slow and move just as fast. They love to talk about farming so of course once I started talking about our farming in Burlington that was opening up a lot of wasted time. The are wonderful people, but need to be prodded a little to get work done.

There will be 3 boilers that will control the heat. We will be able to turn the units off and on when it is snowing

Workers are installing the radiant heat coils. The lay a barrier blanket down first followed by heavy wire than lay the heavy tubing down that is than tired down with zip cords.


This is the completed look after the radiant heat is put down just before the 1st pour is to take place. Due to the fact our driveway is so far back they are having to pump the concrete with huge tubes to the back of the driveway.
There will be 3 boilers that will control the heat. We will be able to turn the units off and on when it is snowing
Workers are installing the radiant heat coils. The lay a barrier blanket down first followed by heavy wire than lay the heavy tubing down that is than tired down with zip cords.
First step before the rest of the 4 colors are added than sealed.